Case Study
4 Bed House
24 Balfour Street | Hertford | Hertfordshire

Client Brief

We were approach by an Architect and introduced to their client to do a full house refurbishment and extend the property with a 2 storey extension which would extend the kitchen area and allow for a new master bedroom.

Project Description

We demolished the existing rear elevation along with the rear roof to enable the construction of the new 2 storey extension thereby extending the kitchen and creating space for a shower and toilet for the ground floor. The first floor now has a new master bedroom and the space was reorganised to include a child's bed by the stairs. All other rooms in the property were also refurbished that also included new flooring, electrical rewiring, and new plumbing. A new patio at the rear of the house was installed with some structural landscaping. Major retaining walls were constructed to accommodate the new drainage.

Project Duration

6 months

TESTIMONIALS

What do customers think

GARAGE CONVERSION

"We had our garage converted to a bedroom with en-suite, Stewart was fantastic, always helpful and knowledgeable, set out clear plans and always kept us updated with progress, he dealt with the planning officer and went the extra mile to help. I would highly recommend using SWJ to any friends and family."

Location: PE28
GARDEN DESIGN

"Stuart provided a planning and installation of a garden design which was trickier due to a heavy sloping lawn. Plans were provided and then works carried out to an excellent standard and was far above expectations. His carpentry skills were very impressive and we are very pleased with the results."

Location: SG11
Installation of power sockets, lights and pir floodlights for workshop and barns

"Stewart designed and installed external and internal lighting for two barns and provided power sockets. I'm very happy with the results which look and work great."

Location: SG12
First floor refurbishment

"Very knowledgeable and professional, couldn't recommend highly enough."

Location: SG14
Bring your vision to reality...
Today is the day to move one step closer in bringing your next project to life. Get in touch with us for a quote.
Start Now